You are in:Home/Publications/Assessing the Risk of the Aswan High Dam Breaching

Prof. Fahmy Salah Fahmy Abdelhaleem :: Publications:

Title:
Assessing the Risk of the Aswan High Dam Breaching
Authors: Fahmy S. Abdelhaleem, Helal Y. Esam, Ibrahim S.A, and Sobeih M.F
Year: 2011
Keywords: Dam Breach, Outflow hydrograph, Aswan High Dam, Simulation Model
Journal: Engineering Research Journal
Volume: Not Available
Issue: Not Available
Pages: Not Available
Publisher: Faculty of Engineering, Minoufiya University
Local/International: Local
Paper Link: Not Available
Full paper Fahmy Salah Fahmy Abdelhaleem_ASSESSING THE RISK OF THE ASWAN HIGH DAM BREACHING.pdf
Supplementary materials Not Available
Abstract:

The present paper assesses the risk of the Aswan High Dam breaching, numerically. Literature, in the field of dam breaching, was reviewed. The Aswan High Dam was visited. Site data, so as measurements data, were collected and analyzed. A suitable numerical model was chosen and was selected to be implemented. Scenarios were designed. The expected impacts of the Aswan High Dam failure that might result from overtopping or piping was simulated and the obtained results were analyzed. Outflow hydrographs due to the failure mode were obtained and analyzed. A risk assessment to the dam breaching was achieved. The results of this investigation could be further applied and could assist decision makers to set a plan to confront the risks of the Aswan High Dam failure.

Google ScholarAcdemia.eduResearch GateLinkedinFacebookTwitterGoogle PlusYoutubeWordpressInstagramMendeleyZoteroEvernoteORCIDScopus